Entire Automated Outdated Tyre Recycling to Rubber PowEPTEPT
hydraulic system comma effortless operation and safe time period
Mechanical description colon the tires much more than 800 need to cut comma and cut into 4 items in EPT periodthe dimension of piece is two hundred-500mm period of time
Notes for using tire cutter colon
a period Examine the knives often comma if look evident blunt comma it should be keep well timed comma and the services is two-three several years interval
b period the oil in hydraulic station ought to be filtered and modified routinely interval EPTly filter when every one particular and 50 % yr time period
c interval Sporting components colon rubber seals comma delivered with yet another established when ship the EPT to the consumer interval
3 amp4 period of time EPT tire shredEPTZPS-900
Use colon
This EPT can straight crush tires smaller sized than 800mm tires interval At the EPT temperature comma can be set right crushed into fifty ast 50 mm block comma so the following rotating can grind into ten-thirty meshes or wire and fiber separation gear time period
Feature colon
This EPT is a compact construction comma innovative technological innovation comma minimal strength intake comma high effectiveness comma smashing off the examination area for the framework comma maintenance is particularly handy semi equipment with carbide surfacing engineering comma substantial hardness comma substantial wear resistance comma and recurring restore using comma so has a EPTer services life semi rotary monitor for the lattice structure of steel mesh comma blanking large region comma enabling the screening of competent rubber period of time After the partition of massive tires can achieve the result of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can right be broken into fifty ast50 mm of rubber block period of time
Notes for employing EPT tire shredder colon
a period Inject gear oil into EPT oil lparhypoid equipment oil rpar comma main bearings use calcium-based mostly grease lubrication comma 3 months right after the procedure of the EPT comma the oil should be replaced and cleanse the fuel tank time period Given that then modify the oil when time every yr period
b After deal with three comma000 tons of squander rubber lparin normal circumstances rpar commathe consumer should grind the blade reducing edge when time period The blades is the use components comma the EPT service existence is 5-6 many years comma when delivering the EPT to the consumer comma the shredEPTwill be outfitted with edge hardness layer patching material lparelectrodes rpar period
5 period Double Rolls Rubber Crusher XKP-560
Use colon
Largely used for crack big rubber blocks into forty-50mm little rubber blocks period
Technical parameters colon
Structure colon The rollers adopt alloy cold challenging cast irons with use-resisting comma tough people period The mill flour is with teeth comma substantial groove time period
In orEPTto lengthen the support existence of the cracker comma we suggest construct foundations for rubber cracker interval
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and tough gear surface area EPT with decrease sounds and EPTer support existence time period
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful working platforms comma all the wires will be connected effectively from controlling method to motor interval When utilizing the EPT comma the customers just need to link directly to the EPT time period
Entire Computerized Old Tyre Recycling to Rubber PowEPTEPT
| No period of time | Name | Model | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | Single hook debeader | LSJ-1200 | 1 | 11 | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | 5 period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | 1 | 90 | ||
| six | Large conveyor products | BCL-eight | one | two | ||
| 7 | Small conveyor gear | BCL-3 | one | one period1 | ||
| eight | Huge Magnet separator | BMS22 | 1 | 2 period2 | ||
| nine | Modest Magnet separator | SMS-one | one | 1 period1 | ||
| ten | Big Shaking display | BSS-8 | one | 7 period5 | ||
| eleven | Tiny Shaking monitor | SSS-3 | one | 3 | ||
| twelve | Fiber separator | FS110 | one | five period5 | ||
| thirteen | Fine Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Square vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | 1 | seven period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | one | period75 | ||||
| fourteen | Metal Baller EPT | 30T | one | seven period5 | ||
| fifteen | Rubber powder EPT EPT | 1 | 3 | |||
| 24 | 334 period4KW | |||||
| No | Title | product | amount | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| 1 | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| 2 | Loop EPT | YQJ-295 | 1 | 15KW | ||
| three | Strip cutter | QTJ-370 | one | 5 period5 KW | ||
| four | Block cutter | QKJ-200 | 1 | 11 KW | ||
| Rubber powder processing colon you will get twenty-thirty mesh rubber powder commaat the identical time comma individual the fiber and metal wire | ||||||
| five | Tyre crusher | XKP400 | 1 | forty five KW | ||
| XKP450 | 55 KW | |||||
| XKP560 | seventy five KW | |||||
| 6 | Large conveyor products | BCL-eight | one | two KW | period | |
| seven | Little conveyor tools | BCL-3 | 1 | one period1 KW | ||
| 8 | Large Magnet separator | BMS22 | one | two period2 KW | ||
| nine | Tiny Magnet separator | SMS-one | one | one period1 KW | ||
| 10 | Massive Shaking screen | BSS-8 | one | 7 period5 KW | ||
| 11 | Modest Shaking monitor | SSS-three | time period | 1 | three KW | |
| 12 | Fiber Separator | FS110 | 1 | eleven KW | ||