High Quality Rubber Powder Making Machine Tire Recycle Plant

High Quality Rubber Powder Making Machine Tire Recycle Plant

Substantial Quality Rubber PowEPTMaking EPT Tire Recycle Plant

The biaXiHu (West Lake) Dis.ally shredEPTshear shredEPTknown by shearing, tearing and pressing the content to achieve diminished measurement, which is primarily utilized for EPT EPT shredder, tires, movies, luggage, and other plastic squander nets Of the broken recycling.
With twin-aXiHu (West Lake) Dis.s independent drive, exclusive knife shaft framework and 4-angle rotary device, in the minimal-speed high-torque production procedure, there will be no winding aXiHu (West Lake) Dis.s, or stuck gear phenomenon, thereby bettering the creation performance.

Software:
one. Plastic: big head substance, engineering plastics, paint barrels, glass
2. Appliances: Television sets, monitors, microwave ovens, dishwashers and other modest and medium-sized home appliances shell, electrical gear
3. Electronic items: computer host shell, difficult travel, CD-ROM, battery shell
four. Pipe: PVC, PE, PP and other pipe, urban water offer pipe, drain pipe
five. Wood: logs, pallets. Wooden chop board, piece of furnishings
six. Rubber: waste auto tires, conveyor belt
seven. Steel: metal sheet such as copper, aluminum or iron, aluminum castings and crush blocks, bikes, vehicle engine housings, oil filters
8. Worn outfits and so on.

Product

Knife Measurement (mm)
Diameter*Thickness)
EPT(kw) Capability(T/H) Knife
Quantity
EPT type EPT Dimension
L*W*H
(M)
Bodyweight
(Ton)
DY-four hundred Phi200 times20 five.5 times2 .two-.three 20 ZQ250 times2 1.nine times0.six times1.5 one.5
DY-600
(six-8teeth)
Phi200 times20 eleven times2 .3-.5 30 ZQ 350 times2 two.6 times1 times2.one two
Phi220 times20 11 times2 .four-1 thirty ZQ 350 times2 2.6 times1.1 times2.1 2.two
DY-800
(6-12teeth)
Phi300 times20 15 times2 .eight-1.2 40 ZQ 400 times2 three times1.two times2.2 3
Phi300 times30 eighteen.five times2 1-one.5 26 ZQ four hundred times2 3 times1.2 times2.two 3.five
Phi300 times40 22 times2 1.5-2 twenty ZQ five hundred times2 3 times1.2 times2.2 five
DY-a thousand
(six-12teeth)
Phi300 times30 30 times2 one.five-two 20 ZQ four hundred times2 3.4 times1.twenty five times2.2 six
Phi300 times40 37 times2 one.eight-two.five 24 ZQ five hundred times2 three.4 times1.25 times2.two 6.three
Phi400 times40 37 times2 2-2.5 24 ZQ 500 times2 three.four times1.25 times2.two six.5
DY-1200
(6-18teeth)
Phi300 times40 45 times2 2.five-three 30 ZQ 650 times2 3.eight times1.twenty five times2.two 8
Phi400 times40 45 times2 two.8-3.3 30 ZQ 650 times2 3.8 times1.twenty five times2.2 eight.five
Phi500 times40 fifty five times2 3-3.5 thirty ZQ 650 times2 3.eight times1.twenty five times2.2 9
DY-1500
(6-18teeth)
Phi300 times30 fifty five times2 three.eight-four.five 50 ZQ 750 times2 4.four times1.five times2.five eleven
Phi400 times40 fifty five times2 4-5 36 ZQ 750 times2 four.four times1.five times2.5 twelve
Phi500 times50 seventy five times2 four.5-5.five 30 ZQ 750 times2 four.four times1.5 times2.5 14
Phi500 times50 75 times2 five-6 thirty ZQ 750 times2 4.4 times1.five times2.5 sixteen
DY-1800
(nine-18teeth)
Phi400 times40 ninety times2 6-7 45 ZSY355*2 5.three times2.1 times2.eight 17
Phi550 times50 90 times2 seven.five-eight.five 36 ZSY four hundred*two 5.three times2.1 times2.eight eighteen
Phi600 times60 ninety times2 nine-10 thirty ZSY four hundred*two five.3 times2.1 times2.eight 19
DY-2000
(9-18teeth)
Phi550 times50 one hundred ten times2 ten-thirteen forty ZSY four hundred*2 six times2.two times3.five 22
Phi600 times60 a hundred and ten times2 12-16 32 ZSY 450*two six times2.2 times3.5 23
Phi650 times60 110 times2 15-20 32 ZSY 450*two six times2.two times3.five twenty five

our firm

Our Companies

one.Pre-sale companies: enthusiasm, client

Give you the suitable prepare, method flow design and producer equipment according to your EPT demand.
two.Sale providers: servant

Ship technicians to the task internet site for XiHu (West Lake) Dis.Hu (West Lake) Dis. the installation and adjustment, training operators and finishing the examine and settle for together with you.
three.Soon after-sale solutions: faithfulness

To establish EPT phrase connection with you, we will frequently spend return check out to consumers.

FAQ

one, Where is your manufacturing unit ?

Our manufacturing unit is located in HangZhou.
two, How EPT is your after-product sales provider ?

We supply eighteen months quality guarantee from the day of supply.
Welcome to get in touch with us if you have any queries.

3, How EPT will take it to produce ?

Typically inside of 15 doing work daEPTafter acquiring the deposit.

four, What is the Method of transportation ?

LCL and FCL by ship.

5, What is actually the payment terms ?

T/T, western union, Alibaba Trade Assurance, L/C and so on.

High Quality Rubber Powder Making Machine Tire Recycle Plant

High Quality Rubber Powder Making Machine Tire Recycle Plant